Thursday, October 10, 2024

The installation

Get to the well and clear it of the sand that has been on it to cure the concrete (this is usually done before we get there) Attach the metal head into the hole in the well. 

Attach the foot valve to the big pipe and lower it into the well to determine the depth. Take it out and measure it for the records. 




Cut it to the correct depth and attach the collar which keeps the pipe from falling into the well. 


Attach the pump to the t handle and then to the small pipe. Place them next to the big pipe to find the correct length and attach the plunger. 



Put them both on the well and rotate the pump on the head until very tight. 


Warm up the spout and attach it. Watch the water come out!!





No comments:

Post a Comment